Behind The Project
Magney Construction has completed a number of projects for the City of Saint Cloud at both their Water Treatment Plant and their Wastewater Treatment Plant.
The most recent project at the Water Treatment Plant was a $9.5 million expansion that increased the plant capacity from 16 MGD to 24 MGD.
The City of Saint Cloud gets their water from the Mississippi River and the water is treated in a Lime Softening Filtration Plant located under Hester Park, which is north of downtown on the banks of the Mississippi.
The project involved the installation of Flocculation Equipment, Plate Settlers with hoseless vacuum solids collection system, Second Stage Clarification, Lime Slaking System, Piping, Pumping Equipment, Instrumentation and Control Modifications and Architectural Modifications.
The project started in October of 2015 and was completed in December 2016.